Facts and Numbers

Technical Comparison of Blocks

How does System 3E compare to traditional outer wall construction materials?

Property System 3E EKO+ Aggregate Block (Fibo) Aerated Concrete (Bauroc) Hollow Concrete Block
Outer wall insulation None required (0% extra layers) Required (min 150-200mm) Required or very thick block Required obligatorily
U-value (finished wall) 0.198 W/m²K ~0.20-0.22 (insulated) ~0.20-0.25 (insulated) ~0.22 (insulated)
Mortar / Glue need None (dry installation) Mortar / Masonry mix Block glue Mortar / Concrete pouring
Fire resistance class REI 240 + M REI 120-180 REI 120-240 REI 180
Speed of installation Very fast (~10 min / m²) Time-consuming (drying time) Medium (glue drying) Time-consuming (pouring+drying)
Weather sensitivity None (frost and rain proof) High (mortar freezes) High (glue freezes) High (concrete cannot freeze)
Wall thickness without finish 352 mm ~350-400 mm with insulation ~375-500 mm ~390-440 mm with insulation

Summary: The System 3E EKO+ block allows building a fully compliant insulated outer wall in a single work operation without installing external insulation (wool or foam). This avoids thermal bridges, saves time, and reduces the total cost of construction.